Skip to product information
1 from 5
TROY LEE DESIGNS

TROY LEE DESIGNS FLOWLINE ORBIT MIPS MTB Helmet Black

The TROY LEE DESIGNS FLOWLINE MTB Helmet combines a relaxed style with high performance. Behind its understated and elegant appearance, it integrates the reliability... Read more
Regular price 99,99 €
Regular price Sale price 99,99 €
View full details

Description

The TROY LEE DESIGNS FLOWLINE MTB Helmet combines a relaxed style with high performance. Behind its understated and elegant appearance, it integrates the reliability of the protection and comfort technologies developed by Troy Lee Designs, all at an affordable price. Equipped with MIPS technology, it reduces rotational impacts in the event of a fall, offering enhanced safety.

With many years of expertise in helmet design, this model optimises safety through advanced features, enabling it to achieve a five-star safety rating awarded by Virginia Tech. Perfectly suited to Trail and All Mountain riding, it offers uncompromising protection while remaining discreet and functional.

SIZES HEAD CIRCUMFERENCE
XS/S 53-56 cm
M/L 57-59 cm
XL/XXL 60-63 cm

Ref: 9320466678109

Informations techniques

Weight (Manufacturer): 375g

3-Way adjustable visor without tool (3 positions) ;
Mips® B32-Series, rotational impact brain protection system ;
360° adjustable retention system with 3-position rear height adjustment ;
14 vents for maximum airflow ;
Full wrap-around in-mold construction ;
EPS liner ;
Trail MTB helmet ;
Lateral strap adjustment:
Classic buckle closure ;
Certification: CPSC 1203, CE EN 1078, AS NZ 2063:2008*, E-bike certified NTA 8776 ;

Informations prix

*Supplier recommended retail price in February 2024