TROY LEE DESIGNS FLOWLINE SE MIPS MTB Helmet Grey/Black
Unable to load collection availability

Description
The TROY LEE DESIGNS FLOWLINE SE MTB Helmet, equipped with Mips® technology and certified for electric bikes eMTB, sets a new benchmark in safety with a modern and minimalist design, and additionally benefits from a five-star safety rating awarded by Virginia Tech.
With its 14 ventilation openings, it provides optimal ventilation to keep you comfortable on the trails. Its interior features an antimicrobial liner that ensures impeccable hygiene, even during the most intense rides. Furthermore, the Fidlock® magnetic closure system guarantees practical and quick use.
Perfect for Trail enthusiasts, this robust and high-performing helmet combines protection, comfort and functionality in a clean style.
| SIZES | HEAD CIRCUMFERENCE |
| XS/S | 53-56 cm |
| M/L | 57-59 cm |
| XL/XXL | 60-63 cm |
Ref: 9320466743645